Q: Do I need to get soil borings performed at the installation site?

A:  

Getting a geotechnical survey done at the installation site will eliminate risks of cost overruns during install. The standard installation prints assume class4 soil type, which is conservative in most areas. The footing depths shown on the installation prints can give scope to the contractor performing the soil borings so they know how deep to take the samples.